Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T08CM03470
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/06/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
04/30/2009 | PLUMBING - FINAL | Not ready for Inspection | 1. PLEASE CALL IN AND HAVE APPROVED ALL REQUIRED INSPECTIONS PRIOR TO CALLING "FINAL" 2. CORRECTIONS MADE AT BAKERY OK |
|
04/29/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. HAND SINK AT BAKERY; CAULK SINK 2. FILL IN VOIDS AROUND PIPES 3. REMOVE REVERSED TEST PLUG; INSTALL COUNTER SUNK TAPPED PLUG W/MACHINE SCREW |
|
04/08/2009 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. SEPARATE NON-CARBONATED BEVERAGES FROM CARBONATED 2. SUPPORT BACKFLOW DEVICES W/AIR GAP 3. SUPPORT MEAT CASE DRAIN W/1" AIR GAP AND USE APPROVED PIPE SUPPORTS ON BEVERAGE DRAINS NOTE: FLOOR SINK MAY NOT MEET MIN. ACCESS REQUIREMENTS |
|
04/02/2009 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* 1. STARBUCKS COMPLETE. 2. OCCUPANCY IS DEPENDENT ON PERMISSION FROM BUILDING INSPECTOR |
|
04/01/2009 | PLUMBING - FINAL | Not ready for Inspection | 1. PLEASE CALL IN AND HAVE APPROVED ALL REQUIRED INSPECTIONS 2. COMPLETE ALL CORRECTIONS PREVIOUSLY NOTED 3. AT STARBUCKS: - TRAP ARM MAY NOT CHANGE SIZE (CHAPTER 10 2006 UPC) - TRAP AND TRAP ARM TO BE THE SAME SIZE - CLEANOUTS REQUIRE 12" CLEARANCE IN FRONT - ALL INDIRECT WASTE PIPING REQUIRES MINIMUM 1" AIR GAP - DRAINAGE PIPING TO BE LONG TURN RADIUS |
|
03/31/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
03/26/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. ELEVATED WATER HEATER REQUIRES DRIP PAN 2. PROVIDE INSULATION ON HOT & COLD 8' IN & OUT OK WATER HEATER PER 2006 I.E.C.C REQUIREMENTS 3. SUPPORT EXPANSION TANK AND REMOVE EXPANSION TANK SHUT OFF VALVE, 2-COMPS REQUIRE CORRECT DRAINAGE 4. 3-COMP SINK REQUIRES SEPARATE INDIRECT DRAIN FOR SANITIZE BOWL 5. PROVIDE MINIMUM 1" AIR GAP AT INDIRECT DRAIN TERMINATIONS 6. PROVIDE BACKFLOW CERTIFICATIONS 7. PROVIDE FACTORY TAPPED C/O PLUGS & MACHINE SCREWS FOR C/O COVERS 8. COMPLETE INSTALL OF ALL APPLIANCES THAT HAVE PLUMBING CONNECTIONS 9. ALL DRAINS TO HAVE MINIMUM FALL AND BE OF APPROVED MATERIALS |
|
03/25/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
03/25/2009 | PLUMBING - FINAL | Cancelled | CANCELLED PER CONTRACTOR JIM DEHORTY #602-702-2502 |