Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
Permit Number - T08CM03466
Inspection Description - PLUMBING - GAS PRESSURE TEST
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/29/2009 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
05/28/2009 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* | |
05/20/2009 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* | |
05/15/2009 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 1. REMOVE AT MOP SINK PER WATER HEATER START UP MAN 2. PROVIDE HOSE CLAMPS 3. PROVIDE BACKFLOW PROTECTION FOR ICE MAKER 4. PROVIDE CABLE ON HOSE BIBS ON ROOF NON-POTABLE WATER 5. COMPLETE OUTSIDE CLEANOUT 6. PROVIDE REPORT FOR STERILIZATION FOR WATER DISTRIBUTION SYSTEM |
|
05/14/2009 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* | |
05/12/2009 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* | |
05/11/2009 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* INSTALL PER APPROVED PLANS FOR ALL GAS PIPING |
|
05/08/2009 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* INSTALL PER APPROVED OR PROVIDE AND NEW APPROVED PLAN |
|
05/07/2009 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1. INSTALL PER APPROVED PLANS 2. PROVIDE APPROVED DRAIN FOR SANITIZER FOR SINKS 3. ADD SUPPORT ON ICE MAKER 4. PROVIDE MIXING VALVES AT LAV 5. LIST NOT COMPLETE COMPLETE INSTALL OF WATER SOFTENER FLOW PROTECTION FOR AJAX AT MOP SINK |
|
05/06/2009 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* | |
04/13/2009 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* | |
04/10/2009 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* |