Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2008 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 10/24/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. PROVIDE 18" IN WALL COPPER PIPING AT WATER HEATER 2. PROVIDE BACKING AND SECURE PROPERLY TUB & SHOWER VALVES (COVER PLATE DOES NOT DO THIS) 3. PROVIDE CORRECT BACKFLOW PROTECTION TO NEW PIPING SUPPLY TO IRRIGATION SYSTEM 4. PROVIDE A GRAVEL FILLED DRY WELL AT WATER HEATER T&P TERMINATION POINT SO 90 DEG. DOWN IS VISIBLE ON EAST SIDE OF BUILDING 5. CONNECT VENT TO DRAFT HOOD PROPERLY |