Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/01/2009 | BUILDING - FINAL | Approved | IVRS - Inspection :* | |
| 04/08/2009 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PAINT ROOF VENTS ABS 2) DBL LUGGED CIRCUIT BREAKERS MAIN PANEL 3) SECURE MAIN PANEL TO BLDG 4) MAIN PANEL NOT GROUNED 5) SECURE CONDUIT AT MAIN TO BLDG 6) INSTALL DEAD FRONT MAIN PROPERTY 7) BLANK COVERS DEAD FRONT/LABEL ALL CIRCUITS 8) COMPLETE GRADING 9) VACUUM BREAKER HOSE BIBS 10) 2-20 AMP APPLIANCE CIRCUITS KITCHEN 11) INSTALL CABINETS AND TOPS WITH SINK 12) SEAL WATER CLOSETS AT BASE 13) ARC FAULT SMOKE ALARMS AND INTERCONNECT 14) WATER HEATER RELIEF CVPC OR COPPER, 90 FITTING TERMINATION |