Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
Permit Number - T08CM03449
Inspection Description - PLUMBING - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/17/2008 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* CORRECTIONS MADE OK OK TO COVER ALL AREAS |
|
11/13/2008 | PLUMBING - INTERMEDIATE | Not ready for Inspection | 1. ONLY 1/3 OF TOTAL DEVELOPED LENGTH OF A VENT MAY BE INSTALLED IN THE HORIZONTAL POSITION 2. HORIZONTAL X HORIZONTAL CHANGE OF DIRECTION TO BE A SWEEP 3. BLAKE TEE LISTED AS A VERTICAL SURFACE WALL CLEANOUT MAY NOT BE INSTALLED HORIZONTALLY. CLEANOUT SHALL BE INSTALLED ABOVE THE FLOW LINE OF THE PIPE 4. ABS SHIM NOT APPROVED SUPPORT 5. ABS TO BE ISOLATED FROM METAL STUDS OK TO INSULATE HOT PIPING PER PLAN 6. ABS TO BE SUPPORTED AT EACH CHANGE OF DIRECTION OR ELEVATION AND AT THE END OF BRANCHES, THEN NO MORE THAN FOUR FEET BETWEEN HANGERS 7. COPPER IN A SIMILAR FASHION |