Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T08CM03449

Parcel: 10818716A

Inspection Status: Approved

Inspection History: PLUMBING - INTERMEDIATE

Permit Number - T08CM03449

Inspection Description - PLUMBING - INTERMEDIATE

Inspection Status - Approved

Date Description Inspector Results Comments
11/17/2008 PLUMBING - INTERMEDIATE Approved IVRS - Inspection :*
CORRECTIONS MADE OK
OK TO COVER ALL AREAS
11/13/2008 PLUMBING - INTERMEDIATE Not ready for Inspection 1. ONLY 1/3 OF TOTAL DEVELOPED LENGTH OF A VENT MAY BE INSTALLED IN THE HORIZONTAL POSITION
2. HORIZONTAL X HORIZONTAL CHANGE OF DIRECTION TO BE A SWEEP
3. BLAKE TEE LISTED AS A VERTICAL SURFACE WALL CLEANOUT MAY NOT BE INSTALLED HORIZONTALLY. CLEANOUT SHALL BE INSTALLED ABOVE THE FLOW LINE OF THE PIPE
4. ABS SHIM NOT APPROVED SUPPORT
5. ABS TO BE ISOLATED FROM METAL STUDS
OK TO INSULATE HOT PIPING PER PLAN
6. ABS TO BE SUPPORTED AT EACH CHANGE OF DIRECTION OR ELEVATION AND AT THE END OF BRANCHES, THEN NO MORE THAN FOUR FEET BETWEEN HANGERS
7. COPPER IN A SIMILAR FASHION