Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - TEMP POWER FOR TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/02/2011 | ELECTRIC - TEMP POWER FOR TEST | Approved | IVRS - Inspection :* | |
| 05/25/2010 | ELECTRIC - TEMP POWER FOR TEST | Partial Approval | IVRS - Inspection :* 1) NEED TO BOND WATER WHEN INSTALLED |
|
| 05/19/2010 | ELECTRIC - TEMP POWER FOR TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) WHAT SIZE SERVICE CONDUCTORS ARE BEING INSTALLED FROM CT CABINET TO TEP XFMR, IF 500 MCM COPER BONDING JUMPER TO CT CABINET AND 4" RISER TO BE 1/0 COPPER 2) WHEN ARE PLANS GOING TO BE REVISED 3) COMPLETELY DRIVE GROUND RODS BELOW GRADE |
|
| 05/04/2010 | ELECTRIC - TEMP POWER FOR TEST | Not ready for Inspection | IVRS - Inspection :* |