Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/18/2010 | FIRE - FINAL | Approved | Approved 2/18/10. | |
| 11/19/2009 | FIRE - FINAL | Denied | Not approved 11/19/09. Unit #1 1.) Need a sign over the fron exit door reading."DOOR MUST REMAIN UNLOCKED WHEN THE BUILDING IS OCCUPIED" 2.) Replace all ceiling tiles and cover plates. 3.) Remove the keyed lock from the rear door. Unit #2 1.) Need same type sign over front door. 2.) Remove keyed from rear security door. |