Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/11/2009 | BUILDING - FINAL | Approved | IVRS - Inspection :* | |
| 11/02/2009 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) TERMINATE TPR VALVE 90 DEGREE TO GROUND 2) STOOPS REQUIRED MINIMUM 3' X 3' EXIT DOORS 3) PROVIDE INSULATION AND STUCCO CERTS |
|
| 10/30/2009 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) NEED WASHER TRAP 2) BACK FLOW PREVENTER (VACUUM BREAKER) FOR HOSE BIBB |