Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T08CM03258
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/06/2010 | ENGINEERING - FINAL | Approved | SITE HAS BEEN COMPLETED PER PLAN | |
12/11/2009 | ENGINEERING - FINAL | Denied | 1) Provide revised site and grading plan 2) Call for final grading inspection prior to Bldg. final |
|
11/05/2009 | ENGINEERING - FINAL | Continued | 1) CHANGES TO BIKE PARKING LOCATION AND WALL LOCATION ALONG EAST SIDE OF NEW BLDG. 2) PROPOSED ADDITION OF ROOF DRAINS FOR NEW BLDG NOT SHOWN ON PLANS. WILL NEED SCUPPERS 3) NEED REVISED DRAWING SHOWING ALL CHANGES MADE TO THE ORIGINAL PLANS. |
|
10/06/2009 | ENGINEERING - FINAL | Continued | 1) CONTRACTOR WILL CHANGE THE LOCATION OF THE ROOF DRAIN ALONG NE CORNER OF EXISTING BLDG - ENG OF RECORD APPROVED CHANGE. 2) ENSURE YOU PROVIDE A MINIMUM OF OF ONE PEDESTRIAN CIRR. PATHWAY THAT MEETS ANSI/ADAAG REQUIREMENTS. |
|
08/04/2009 | ENGINEERING - FINAL | Continued | INSPECTION WAS FOR CLARIFICATION ON CHANGES MADE TO SITE/GRADING PLAN. NO SIGNIFICANT CONCERNS WITH THE SITE AT THIS TIME |