Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/26/2009 | ENGINEERING - FINAL | Approved | All items completed on punch list. Approved | |
| 07/29/2009 | ENGINEERING - FINAL | Continued | No final C of O untill the following items are complete. 1) Remove all temp. fence 2) Remove all construction materials, dumpsters, debris. 3) Place splash bolcks at downspouts in planter areas. 4) finah all sidewalks including scuppers at downspouts. 5) finish all landscape and outside construction. 6) remove office trailer and stabilize construction yard area. |
|
| 07/07/2009 | ENGINEERING - FINAL | Continued | Contractor wanted to pour driveway approach, informed them that they need a ROW permit and inspection, gave direction on how to obtain a permit from transportation. | |
| 06/12/2009 | ENGINEERING - FINAL | Partial Approval | OK for Temp C of O for moving furniture, Install const. fence to separate const. from public remove const. debris backfill S/W and LS areas. |