Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - PROGRESS
Permit Number - T08CM03132
Inspection Description - PLUMBING - PROGRESS
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/08/2009 | PLUMBING - PROGRESS | Approved | IVRS - Inspection :* 1) PROVIDE LABELS AT NON POTABLE OUTLETS 2) PROVIDE CERT FOR RP |
|
09/30/2009 | PLUMBING - PROGRESS | Partial Approval | IVRS - Inspection :* 1) WATER TEST ON RAIN GUTTER DRAINAGE OK |
|
09/29/2009 | PLUMBING - PROGRESS | Not ready for Inspection | IVRS - Inspection :* | |
09/14/2009 | PLUMBING - PROGRESS | Partial Approval | IVRS - Inspection :* 1) VENT FOR FLOOR SINK IN ELECTRIC ROOM PROPERLY SECURED IN WALL 2) PROVIDE CAPS ON ALL SANITARY SYSTEM INSIDE BLDG SO THERE IS NO SEWER GAS IN OCCUPIED SPACE |
|
09/11/2009 | PLUMBING - PROGRESS | Not ready for Inspection | IVRS - Inspection :* 1) CONTRACTOR CANCELLED |
|
09/04/2009 | PLUMBING - PROGRESS | Not ready for Inspection | IVRS - Inspection :* 1) FIXTURE REQUIRES A VENT 2) PROVIDE ENGINEER APPROVAL TO USE AAV |
|
08/17/2009 | PLUMBING - PROGRESS | Not ready for Inspection | IVRS - Inspection :* | |
08/14/2009 | PLUMBING - PROGRESS | Partial Approval | IVRS - Inspection :*. 1) RWLS IN SLAB-OK |
|
08/11/2009 | PLUMBING - PROGRESS | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE DRAINAGE FITTINGS WITH TEST WITHIN BLDG 2) CALL MKE RUSSO WITH ENGINEERING TO INSPECT STORM DRAINAGE OUTSIDE OF BLDG |