Inspection Status: Approved
Inspection History: REINFORCED MASONRY PRE-GROUT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/08/2009 | REINFORCED MASONRY PRE-GROUT | Approved | IVRS - Inspection :* | |
| 09/02/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1) 27' OF NORTH ENTRY RAMP FOOTING |
|
| 09/01/2009 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | IVRS - Inspection :* 1) RAMP F2 FOOTING NOT 18" WIDE |
|
| 08/21/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1) FRONT ENTRY AT STAIRS |
|
| 08/18/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1) EAST COURT YARD TOP OUT OK |
|
| 08/14/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1) ENTRY STEP FOOTERS |
|
| 08/12/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1) EAST SIDE COURTYARD 12" CMU COLUMNS |
|
| 07/30/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1) PARTIAL APPROVAL FROM 0' TO 3' AFFE AT EAST COURT YARD WALL |
|
| 03/26/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* INSPECTED MAIN HOUSE ONLY: 1) COLUMNS ARE NOT COMPLETED 2) COURTYARD EXT. WALL NOT STARTED (EAST) |
|
| 03/12/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1) INSPECTED BOND BEAM ABOVE STEEL BEAM-OK-TO CONTINUE NEXT LIFT |
|
| 02/25/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1) OK TO GROUT BOND BEAM AT GARAGE AND FINAL 6" LIFT OVER GUEST ROOM 2) MISSING V-BAR AT INTERSECTION OF GARGAE WALL TO KITCHEN 3) WILL NEED ENGINEERING FIX |
|
| 02/23/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* OK TO GROUT ALL OF SOUTH & EAST & NORTH EXT. WALL 2ND FLR. PART OF WEST WALL, STILL WAITING ON BEAM |
|
| 02/17/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1) INSPECTED 2ND FLOOR-1ST LIFT-EASTWALL-WESTWALL UP TO CLOSET AND SOUTH WALL OVER LOOKING COURT YARD |
|
| 02/11/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1) OK TO GROUT ALL OF 1ST FLOOR TO HOUSE AND GARAGE 2) COURTYARD EAST SIDE STILL NOT-CONSTRUCTED 3) ALL REVISION TO PLANS MUST BE MADE BY PLAN CHECKER OR CITY OFFICIAL WITH HIS SIGNATURE. OTHER WISE PLEASE DON'T MARK UP PLANS, DUE TO CONFUSION |
|
| 02/04/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* INSPECTED ARCHWAY OPENING AT COURTYARD |
|
| 01/29/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* INSPECTED COURTYARD WALLS UP TO 11'0" STILL WAITING ON ARCHES |
|
| 01/26/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1) OK TO GROUT SOUTH END WALL OF GARAGE-TOPPED OUT 2) INSPECTED ALL EXT. WALLS UP TO 11'-0" EXCEPT FOR OPENING ON EAST WALL OF COURT YARD. EXT. WALLS ONLY-OK TO GROUT UP TO 11'-0" 3) NEED ENGINEERING OR CHANGE ON DETAIL A1.2/3 ALSO DELETION OF CMU SCREEN WALL |
|
| 01/09/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1) OK TO GROUT 1ST LIFT 2) EAST WALL AT COURTYARD STILL NOT READY |