Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/03/2008 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 12/02/2008 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1. CANNOT USE A LOW HEEL FITTING AT TOILET 2. TRAP VENT FOR SHOWER TO BE IN PLACE 3. YOU WILL NEED TO DIG UP AT SEWER, TRENCH OVER TO BLDG. LINE 4. I DON'T THINK YOU CAN PLUMB THIS LAYOUT THIS SHALLOW |
|
| 11/26/2008 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SOIL PIPE: DO NOT USE SANT TEE'S LAYING ON THEIR BACK, ONLY IN THE VERTICAL POSITION 2) NEED COMBO FITTING AT TOILET & LONG SWEEP 2" UP TO VENT 3) AT LAV USE 3 X 3 X 2 COMBO NOT SAN-TEE 4) AT SHOWER NEED TRAP 2" & VENT SEE SUGGESTED DRAWING LEFT ON PLAN, NOTE: DON'T GO HORIZONTAL WITH VENT UNTIL 6" ABOVE FLOOD RIM OF SHOWER 5) DETERMINE SEWER DIRECTION AND DEPTH BEFORE INSTALLING SOIL AND HANDICAP SHOWER |
|
| 11/25/2008 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1) NO PIPES INSTALLED |