Permit: T08CM03027

Parcel: 117072750


Addresses:

707 S 2ND AV

Inspection Status: Approved

Inspection History: BUILDING - FINAL

Date Description Inspector Results Comments
01/08/2009 BUILDING - FINAL Approved IVRS - Inspection :*
01/07/2009 BUILDING - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) GROUND WIRE NEEDS TO ATTACH TO GROUNDING LUG IN METER BOX
2) DO NOT INSTALL METER LOCKING RING UNTIL AFTER INSPECTION
3) DO NOT ACTIVATE SYSTEM UNTIL AFTER INSPECTION
4) DISCONNECT HAS 30 AMP FUSES ON #12 WIRE
5) SECURE CONDUIT BRACKETS TO ROOF