Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/15/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 11/28/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. COMPLETE ALL WORK INCLUDING INSTALLATION OF ALL BEVERAGE EQUIPMENT 2. EACH PIECE OF EQUIPMENT THAT MAY CAUSE POLLUTION OR CONTAMINATION OF THE WATER SYSTEM REQUIRES BACKFLOW PROTECTION. 3. SEE UPC 603.2 FOR DEVICES OR METHODS 4. PROVIDE BACKFLOW TEST REPORTS 5. PROVIDE HOSE BIB VACUUM BREAKERS 6. PROVIDE WATER STERILIZATION AND DOCUMENTATION PER 609.9 7. INSTALL PLUGS IN ANY OPEN CLEANOUTS 8. SEAL W/APPROVED THREAD SEALANT 9. COMPLY W/THE CODE REQUIREMENTS FOR INDIRECT WASTE PIPING AND RECEPTORS 10. 1" MIN. AIR GAP REQUIRED 801.1 11. I.W PIPES MAY NOT REDUCE IN SIZE 801.2.1 12. I.W PIPES EXCEEDING 5' SHALL BE DIRECTLY TRAPPED 803 13. CLEANOUTS REQUIRED AT CHANGES OF DIRECTION 14. PIPING AND RECEPTORS SHALL BE OF SUCH CAPACITY TO PREVENT FLOODING - 804.1 15. PROVIDE 1/4" PER FOOT SLOPE 16. HAND SINK TAIL PIECE AND CAULK 17. WC OPEN FRONT SEATS 18. AS A COURTESY, A GAS CARD HAS BEEN PROVIDED |
|
| 11/25/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* COMPLY W/BASIC PLUMBING CODES COMPLETE ALL WORK, FOLLOW PLAN SPECS OWNER AGGRESSIVE INSPECTION STOPPED |