Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/12/2010 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 02/19/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE A SOLID, DIRECT CONNECTION UP STREAM OF RP THEN RECERT ASSEMBLY 2) PROVIDE SLOPE, SUPPORT AND AIR GAPS AT INDIRECT DRAINS 3) SEAL THREADS ON AAV CONNECTION TO VENT |
|
| 08/25/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE AN ACCURATE PLAN SHOWING ALL CHANGES AS REQUESTED 2) PROVIDE AIR GAPS, CORRECT CONNECTIONS AND BACKFLOW PROTECTION AS REQUIRED BY CODE. RECERT OF BACKFLOW |
|
| 08/24/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) NO PHONE NUMBER PROVIDED BY CHRIS 2) ? CAPPED ACCORDING TO CHRIS. SHOW ON AS BUILT PLAN 3) PLAN REVISED TO SHOW 2" NO CONN TO 4"; ABS AT TIE IN LOCATION 4) 5 PSI AIR TEST HOLDING 5) 1/2" WATER INSTALLED OVERHEAD OK |
|
| 07/23/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* |