Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - PROGRESS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/19/2009 | PLUMBING - PROGRESS | Approved | IVRS - Inspection :* | |
| 08/18/2009 | PLUMBING - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 08/13/2009 | PLUMBING - PROGRESS | Not ready for Inspection | IVRS - Inspection :* 1) RECIRC PUMP, MIXING VALVE. RED LINE ANY CHANGES 2) WATER HEATER NOT ON PLAN 3) HOSE THREADS ON MS 4) PROVIDE ROOF ACCESS TO INSPECT VENT TERMINATORS 5) PLASTIC REQUIRES UV PROTECTION 6) PROVIDE A DOCUMENTRY PROCEDURE FOR YOUR STERILIZATION FOLLOWED BY A CLEAN BACTERIA REPORT 7) PROVIDE A COPY OF IRR BACKFLOW CERT |
|
| 06/08/2009 | PLUMBING - PROGRESS | Not ready for Inspection | IVRS - Inspection :* COMPLETE HW LOOP TO WH, PLAN SPECIFIES A RECIRC PUMP NOTE: WATER SYSTEM STERILIZATION IS REQUIRED AT FINAL APPROVAL AS WELL AS CORRECT BACKFLOW PROTECTION AT IRRIGATION AND HOSE BIBS |
|
| 06/04/2009 | PLUMBING - PROGRESS | Not ready for Inspection | IVRS - Inspection :* NOTE: ALL FIXTURES AND WH HAVE BEEN REMOVED FOR REPLACEMENT. HW OVERHEAD AND WATER PIPING IN WALL IS NOT "EXISTING" |