Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
Permit Number - T08CM02806
Inspection Description - PLUMBING - ROUGH, SOIL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/07/2010 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
12/03/2009 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* OUTSIDE BUILDING TIE IN OK (ONLY) |
|
11/20/2009 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) 4" INSTALLED FROM 2 WAY CLEANOUT AND AT BLDG TO TIE IN ONLY 2) PROVIDE TEST AND TRACER WIRE |
|
10/09/2009 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) COMPLETE PLUMBING PLAN NOTE #24 2) INSTALL THERMOSTATIC MIXING VALVE PER PLAN 3) HAVE APPROVED RED LINES ON SITE 4) LETTER FOR TYPE M COPPER |
|
06/10/2009 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1. TEST ON ROUGH SOIL OK 2. PROVIDE APPROVED PLAN FROM CITY FOR ALL CHANGES 3. CALL BACK FOR PRE-SLAB |
|
06/09/2009 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1. UNCOVER ALL FITTING 2. PROVIDE FULL SIZE 3" CLEANOUT PER APPROVED PLANS 3. STOP WATER FROM DRIPPING |
|
06/05/2009 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. INSTALL PER APPROVED PLAN FOR BUILDING DRAIN (4") 2. PROVIDE FULL SIZE UPPER TERMINAL CLEANOUT 3. NOTE: P-4 FIXTURE TYPICALLY REQUIRES UNDERGROUND P-TRAP 4. PROVIDE MINIMUM FALL ON ALL DRAINAGE PIPING |