Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/31/2009 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 08/13/2009 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* | |
| 07/30/2009 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) GAS TEST OK, SUPPORT PIPING IN STUD WALL SAFETY PLATES REQUIRED FOR PIPING WITHIN 1 1/4" OF STUD FACE |
|
| 07/24/2009 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) AAV OK PER K PATRICK 2) ABS OK PER TIGLAS ENGINEERING 3) VENTS OK 4) INSULATION OK, SUPPORT PIPING ABOVE CEILING |
|
| 07/21/2009 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) DWV WITH TEST OK, EXCEPT AT NEW HS |
|
| 07/20/2009 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) ENERGY CODES REQUIRE 1" OF INSULATION ON HW AND HWR LINES 2) PROVIDE CLEARANCE AROUND PIPING FOR INSULATION, THEN YOU MAY INSULATE PER PLAN 3) RECALL FOR INSULATION INSPECTION 4) NON CARBORNATED BEVERAGES AND ICE MAKER MAY REQUIRE BACK FLOW PROTECTION 5) FULL SIZE UP STREAM CONNECTION REQUIRED FOR 007 AND 009 CONN. |
|
| 07/17/2009 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
| 07/14/2009 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* |