Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/03/2009 | ENGINEERING - FINAL | Approved | ||
| 04/02/2009 | ENGINEERING - FINAL | Not ready for Inspection | NOT READY WORK STILL ONGOING WASHOUT TO BE CLEANED UP |
|
| 04/02/2009 | ENGINEERING - FINAL | Not ready for Inspection | TALKED WITH LOU BOCK DQ IS TO BE REPLACED ALONG WITH LANDSCAPE CLEAN UP WORK 4/7 |
|
| 04/01/2009 | ENGINEERING - FINAL | Not ready for Inspection | UNABLE TO LOCATE ANYONE ON SITE TO DISCUSS L/H/N/ REQUEST FROM ZONING INDICATING REVISED PARKING CALCULATIONS. CALLED AARON WITH ENVISION CDI (925-560-9906) AND ADVISED HIM THAT IF HE WANTED AN INSPECTION ON THE PROPERTY TOMORROW, HE WOULD NEED TO CALL IT IN BEFORE 2:30 TODAY. |