Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/03/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 04/01/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* - PROVIDE CHLORINE & BACTERIA REPORT FOR POTABLE WATER SUPPLY. - PROVIDE IN HOUSE BACKFLOW CERTIFICATIONS. 1. EXPOSE ALL CLEANOUTS 2. PROVIDE TEMPERING TO NOT EXCEED 110 DEG. AT PUBLIC USE LAVS HOT WATER SUPPLY 3. CONDENSATE TO TERMINATE AT VERTICAL BRANCH TAILPIECE UPSTREAM OF P-TRAP 4. PROVIDE LISTING, 1" AIR GAP OR BACKFLOW PROTECTION FOR ICE MACHINE WATER SUPPLY 5. LABEL PROCESS LIQUID PIPING AND POTABLE WATER PIPING IN PROCESS PIPING ROOM 6. BREAK OFF TAMPER SCREW ON VACUUM BREAKER FOR HOSE BIB 7. REMOVE RESTRICTION IN CONDENSATE DRAINS AT LAVS |