Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T08CM02730
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/27/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
04/28/2009 | PLUMBING - FINAL | Cancelled | CANCELLED PER CONTRACTOR 214-435-0877 | |
04/15/2009 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* COMPLY W/NOTES FROM 1/21 & 2/11 YOU MUST PROVIDE AN AIR GAP BETWEEN ICE BIN DRAIN AND RECEPTOR SEE PICTURE ON BACK OF EQUIPT. PROVIDE THE INSTALLATION INSTRUCTIONS FOR ICE MAKER I DO NOT BELIEVE THAT THIS EQUIPMENT IS LISTED TO BE SET ON FLOOR. ALSO, WATER SUPPLY CONN. IS LEAKING |
|
02/11/2009 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* AT COFFEE BAR: 1. ICE MAKER DRAIN REQUIRES AN AIR GAP AT CONDENSATE PUMP CONNECTION 801.1, 801.2.1 2. INDIRECT WASTE RECEPTOR IS FOR BOTH COFFEE AND ICE MAKER 3. REVISED PLAN DETAIL SHOWS RECEPTOR SEPARATELY VENTED 4. THIS INSTALLATION ACTUALLY IS TWO FIXTURES; ONE HAND SINK AND ONE RECEPTOR WET VENT AND VENTED BY ONE AAV NOTE: A HUB DRAIN IS NOT AN APPROVED RECEPTOR (804) 5. REVISE PLAN TO ACCURATELY SHOW INSTALLATION (802) 6. A WEDGE OF ABS DOES NOT CONSTITUTE AN APPROVED PIPE SUPPORT AT HOSTESS STATION: 1. PROVIDE AIR GAPS AT SODA & ICE BIN DRAINS 2. OTHER CORRECTIONS AND BACKFLOW CERTS OK |
|
01/21/2009 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. INDIRECT WASTE RECEPTOR AT COFFEE SHOP (HUB DRAIN) NOT PER PLAN. 2. CORRECT SLOPE, PROVIDE SUPPORT 3. PROVIDE AN AIR GAP FOR ICE MAKER DRAIN 4. PROVIDE CLEANOUT PER PLAN REVIEW NOTES 5. 2-DOUBLE CHECK VALVE BACKFLOW CERTS FOR COFFEE AND ESPRESSO RECEIVED 6. REINSPECTION OF SODA DISPENSER HAS REVEALED TWO WATER SUPPLY CONNECTIONS; ONE IS TO CARBONATOR AND ONE CONNECTS TO ANOTHER INLET. WAYNE SWAN NOTIFIED VIA COURTESY PHONE CALL. |
|
01/09/2009 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* PRE-FUNCTION 1ST LEVEL TOILET RMS. OK LOBBY TRS OK BAR AREA OK BUFFET LINE OK AT HOSTESS STATION, CORRECT PTRAP INSTALLATION AT SINK AND PROVIDE SEPARATE BACKFLOW PROTECTION FOR NON-CARBONATED BEV. |
|
12/19/2008 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* PLEASE HAVE PLANS & PERMIT ON SITE AND READY TO SHOW INSPECTORS FOR YOUR PROJECT HAVE A PERSON ON SITE TO PROVIDE INSPECTION INFORMATION TO THE INSPECTOR AT NEXT INSPECTION THAT KNOWS WHERE THE AREA FOR INSPECTION IS. FAILURE TO PROVIDE THIS HAS RESULTED IN REINSPECTION FEE AS PER NOTE #6 FROM 12/5/08 PLEASE CALL IN 03005, 03035, 03075 SO WE CAN APPROVE THESE AND ANY OTHER PLUMBING INSPECTIONS PRIOR TO FINAL INSPECTIONS. |
|
12/17/2008 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. THEATER TOILET RMS; FIXTURES OK WORK NOT SHOWN ON PLUMBING PLAN 2. LOBBY TOILET RMS. REPLACE DAMAGED CO PLUGS 3. SEWER GAS SMELL PRESENT (PLUG HAS 2 HOLES IN IT) 4. HAVE LICENSED PLUMBING CONTRACTOR CORRECT UNSANITARY CONDITION 5. INSTALL A PLUG THAT IS LISTED TO RECEIVE SCREW |
|
12/05/2008 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. LOBBY TRS 2. WOMENS SIDE WC's NOT SEALED AT CONNECTION TO FLOOR LAVATORY DRAIN CONNECTION REQUIRES APPROVED TRAP ADAPTORS 3. ALSO, NEED TO CHECK CO PLUG BELOW URINAL 4. RESTROOMS APPEAR TO BE IN USE - YOU DO NOT HAVE APPROVAL IN THIS AREA 5. OCCUPYING AN AREA PRIOR TO APPROVAL IS A VIOLATION OF BUILDING CODES AND SUBJECT TO FINES 6. CONTINUED DENIED INSPECTIONS MAY RESULT IN REINSPECTION FEES |
|
12/04/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
11/20/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* BAR: 1. INDIRECT DRAINS MAY NOT COMBINE EXCEPT THAT I WILL ALLOW THE 2 RPA DRAINS TO COMBINE OF SIZED CORRECTLY 2. REMOVE ICE BIN DRAIN AND PIPE IT SEPARATELY 3. STILL HAVE BACKPITCH ON ONE DRAIN 4. THREADS ON AAV's HAVE NOT BEEN SEALED. 5. EXPOSE ALL AAV's FOR INSPECTION 6. DRIP ON SODA SUPPLY AT RPA CONN. NOTE: BOTH ASSEMBLIES REQUIRE TEST AFTER UPSTREAM WORK WAS COMPLETED ASSEM. #55141 CERT. RECEIVED OK BUFFET: 1. FLOOR SINK DOES NOT COMPLY W/ACCESSIBILITY REQUIREMENTS OF UPC SEC. 804.1 2. INDIRECT DRAINS MAY NOT EXCEED 15' FIXTURE ADDED IS NOT SHOWN ON PLAN 3. CAULK HAND SINK CONN. AT WALL GAS TO FIRE PIT; STILL NEED ENGINEER'S APPROVAL FOR PE INSTALLED. NOTE: G-3 SPECS. SCOTCHKOTE - FIXTURE REPLACEMENT/REINSTALL REQUIRES INSP. - CAULK FIXTURE CONN. TO WALLS AND FLOORS CONNECT CONDENSATE - IS THERE A TRAP PRIMER VALVE? (CONNIE & JUAN PRESENT) |
|
11/18/2008 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. INDIRECT DRAINS HAVE BACKPITCH AND ARE SUPPORTED WITH UNAPPROVED CABLE TIES AND P-TAPE 2. YOU MAY COMBINE RPA DRAINS IF YOU SIZE THEM CORRECTLY. 3. YOU HAVE DRIPS ON SUPPLY TUBING 4. PROVIDE ACCESS TO ALL AAV's 5. YOUR PLUMBING PLANS SPECIFY DIRECT CONNECTIONS FOR BOTH HAND SINKS. YOU HAVE ONLY INSTALLED ONE HS AND IT IS PIPED INDIRECTLY 6. PROVIDE BACKFLOW CERTS FOR BOTH ASSEMBLIES DATED AFTER ALL WORK HAS COMPLETED |
|
11/10/2008 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. CORRECT/SUPPORT DRAINS TO DISCHARGE OVER OPENING IN GRATE. 2. INSTALL DOME STRAINERS 3. CORRECT DRIP AT ANKLE STOP 4. PROVIDE ACCESS TO AIR ADMITTANCE VALVES INSTALLED BEHIND PERMANENT FIXTURES 5. BACKFLOW PROTECTION REQUIRED FOR NON-CARBONATED BEV (EACH WATER SUPPLIED EQUIPT) |
|
10/29/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* COMPLETE ALL PLUMBING AT THIS AREA, PROVIDE INSTALL OF ALL EQUIPMENT REQUIRING PLUMBING CONNECTION, PROVIDE ALL BACKFLOW DEVICES FOR WATER THAT ARE REQUIRED FOR EQUIPMENT WITH CERTIFICATIONS. INSTALL DRAINAGE PER PLAN, WITH CORRECT DRAINAGE FITTINGS & AIR GAPS AS REQUIRED. LIST NOT COMPLETE. |