Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - ABOVE CEILING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/16/2008 | MECHANICAL - ABOVE CEILING | Approved | ||
| 09/04/2008 | MECHANICAL - ABOVE CEILING | Denied | DUCTING NOT PER PLAN, INSTALLATION INCOMPLTETE, REFERENCE DETAIL 3 PP. M2.2. FOR MAXIMUM LENGTH OF FLEX DUCT. MECHANICAL CHANGES REQUIRE PLAN REVISION. TO CONTINUE WITH INSPECTION THE MECHANICAL CONTRACTOR NEEDS TO RED-LINE PLANS AND HAVE LETTER FROM ENGINEER INDICATING REVISION WILL BE ACCEPTABLE AND FORTHCOMING. |
|
| 08/26/2008 | MECHANICAL - ABOVE CEILING | Denied | IVRS - Inspection : See detailed listing on site.| 999* NO MECHANICAL OR GENERAL CONTRACTOR ON SITE |