Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/05/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 03/04/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. LABEL AND VERIFY ALL BACKFLOW DEVICES 2. PROVIDE DOMES AT FLOOR SALES 3. PROVIDE VACUUM BREAKER AT HOSE BIB EXTERIOR RECEIVED LETTER FROM ENGINEER & ARCHITECT GIVING OK FOR USE OF ALTERNATE CITY APPROVED BACKFLOW DEVICES USE IN PLACE OF RPA's PER PLAN 4. TERMINATE SODA RPA DRAIN ASSEMBLY PROPERLY |
|
| 12/17/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* HAVE PLAN AND PERMIT ON SITE WENT THRU REQUIREMENTS FOR BACKFLOW PROTECTION & INDIRECT DRAINAGE REQUIREMENTS WITH CHRIS ON SITE |
|
| 12/02/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 11/19/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* NOT INSTALLED PER PLAN REVIEWED KEYED NOTES AND GENERAL PLUMBING NOTES WITH G.C IN REGARD TO WHAT IS REQUIRED BY THE PLAN AND BY CODE. |