Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/23/2008 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 10/20/2008 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* COMPLETE YOUR SINK VENT WITH TEST PROVIDE APPROVED SUPPORT FOR OVERHEAD WATER PIPING PROVIDE APPROVED TRANSITION FOR PVC TO ABS FOR VENT PIPING, HAVE PLANS AND PERMIT ON SITE, COMPLETE WORK PRIOR TO CALLING FOR INSPECTION OR YOU COULD BE REFEE'd PIPE WRAPS & FLOOR SINKS OK |
|
| 10/17/2008 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1. INSTALL VENT FOR HAND SINK, PROVIDE TRANSITION COUPLING APPROVED FOR ABS TO PVC ABOVE CEILING ON VENTING AND RETEST 2. PROVIDE LETTER GIVING OK FROM ENGINEER SEALED BY HIM FOR EXCEPTION TO COLOR CODED PEX ON THIS JOB WITH CORRECT APPROVED SUPPORT FOR OVERHEAD WATER PIPING. |
|
| 10/16/2008 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1. WHERE A VENT CONNECTS TO A HORIZONTAL DRAIN IT SHALL HAVE ITS INVERT TAKEN OFF ABOVE THE DRAINAGE CENTER LINE, DOWNSTREAM OF THE TRAP BEING SERVED. EACH VENT SHALL RISE VERTICALLY TO A POINT NOT LESS THAN 6" ABOVE THE OVERFLOW BEFORE OFFSETTING HORIZONTALLY. VENTS MAY NOT BE CONNECTED BELOW THE FLOOD RIM. |
|
| 10/15/2008 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* NOT INSTALLED PER PLAN HORIZONTAL VENTING BELOW FLOOD RIM LIMITED TO STRUCTURAL CONDITIONS. WHEN ACCEPTED, VENT FITTINGS INSTALLED BELOW THE FLOOD RIM SHALL BE DRAINAGE TYPE. |