Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T08CM02682
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/03/2009 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
07/14/2009 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1) FINAL PENDING APPROVAL OF RED LINE DRAWINGS SUBMITTED TO CITY PLAN REVIEW |
|
06/30/2009 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) COMPLETE ALL INSPECTION ITEMS FROM 11/19/08 2) NEED TO PROVIDE RED LINE DRAWINGS FOR ALL CHANGES IN FIELD 3) HAVE COMPLETE BY NEXT INSPECTION OR WILL HAVE TO PAY RE-INSPECTION FEE |
|
06/03/2009 | ELECTRIC - FINAL | Denied | IVRS - Inspection : A reinspection fee has been assessed for this inspection. Multiple inspection Electrical contractor to be on site for all further inspections Need to provide ladder for above ceiling inspection Plans left on site have no electric sheet Ensure all items from inspection on 11/19/08 have been completed Pay reinspection fee prior to next inspection |
|
03/06/2009 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* NEED TO HAVE APPROVED PLANS ON SITE. HAVE ELECTRICAL CONTRACTOR GO THROUGH ENTIRE JOB INSTALL PER APPROVED PLANS AND NEC. NEXT INSPECTION WILL RESULT IN REFEE IF ABOVE ITEMS NOT COMPLETE |
|
11/19/2008 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. INSTALLATION NOT PER PLANS. INSTALL PER PLANS OR REVISE PLANS 2. STRAP MC CABLE WITHIN 12" OF CONNECTIONS AND EVERY 6' BETWEEN. NOT TO LAY ON CEILING 3. REMOVE OLD WIRING 4. GROUND METAL BOXES 5. SEAL OPEN KNOCKOUTS 6. JUNCTION BOXES OVERFILLED. NEED 6" OF FREE CONDUCTOR LENGTH 7. USE CONNECTORS ON MC WHERE ENTER EQUIPMENT OR RACEWAYS 8. RE-IDENTIFY WHITE WIRES USED AS PHASE CONDUCTORS 9. NEED UPDATED PANEL SCHEDULES 10. WHERE ARE ALL NEW CIRCUITS SHOWN ON PLANS 11. SEE NOTE 7 ON PLANS FOR GFI PROTECTION 12. ELECTRICAL CONTRACTOR TO INSTALL PER PLANS & NEC |