| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/15/2010 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* 1) CLOSET FLANGE OK |
|
| 12/13/2010 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) MAY NOT INTERMINGLE ABS AND PVC |
|
| 07/30/2010 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) NEED TO SEE CLOSET FLANGE |
|
| 07/28/2010 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) HOW ARE YOU GOING TO PROVIDE 12" OF COVER OVER PVC DWV OUTSIDE ? |
|
| 07/27/2010 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) OK TO COVER UNDER FLOOR |
|
| 07/14/2010 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) CORRECT BACK PITCHEDF SECTIONS 2) WASTE AND OVERFLOW WILL REQUIRE ACCESS PANEL |
|
| 04/30/2010 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
| 04/15/2010 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) TEST ON GAS PIPING 2) CAP OPEN PIPES FOR HEALTH AND SAFETY LAST WARNING 3) PROVIDE TEST ON NEW PIPING 4) SWEEP REQUIRED ON HORIZONTAL CHANGE OF DIRECTION 5) COPPER SPECIFIED ON PLAN, PROVIDE A LETTER FOR CHANGE 6) INSTALL AN APPROVED TRANSITION COUPLING AT WC VENT, WITH PROPER ALIGNMENT 7) SEWER AND GAS VENTS REQUIRE A MINIMUM OF 10' CLEARANCE FROM COOLER AIR INTAKE |
|
| 10/02/2009 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) SUPPORT ALL STUB OUTS 2) FURNCO COUPLINGS NOT PERMITTED INSIDE OR UNDER A BLDG 3) LAVATORY HAS NO VENT, TRAP ARM MAY NOT CHANGE ELEVATION AND CAP OFF ALL OPEN PIPES 4) ABS NOT PERMITTED IN EXPOSED EXTERIOR LOCATIONS 5) ALL COPPER TO BE SUPPORTED 6) NO VENT AT KITCHEN SINK 7) NOTE: TUB AND SHOWER VALVE WILL REQUIRE TEMPERING VALVE 8) THIS MAY NOT BE A COMPLETE LIST |