Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 07/29/2009 |
ENGINEERING - FINAL |
|
Approved |
Approved |
| 07/21/2009 |
ENGINEERING - FINAL |
|
Partial Approval |
FInish items 1,2,3,4,11 on final grading permit T08BU01469 prior to final. |
| 07/17/2009 |
ENGINEERING - FINAL |
|
Partial Approval |
OKAY FOR THE TEMPORARY C OF O. 1) COMPLETE ALL SITE WORK PRIOR TO REQUESTING THE FINAL C OF O FOR THIS SITE, ADDITIONAL SITE WORK IS ONGOING AT THIS TIME. 2) PROVIDE A SET OF AS-BUILT DRAWINGS FOR ALL OF THE CHANGES THAT HAVE BEEN MADE TO THIS SITE SO THAT IT CAN BE UTILIZED FOR THE FINAL INSPECTION. 3) PROVIDE A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD FOR THE WORK ON THIS SITE AS WELL AS ALL OF THE CURRENT MODIFICATIONS. |