Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/01/2009 | ENGINEERING - FINAL | Approved | Contractor addressed punch list. | |
| 03/25/2009 | ENGINEERING - FINAL | Denied | 1. RELOCATE WHEEL STOPS TO PROVIDE 18' PARKING SPACES. (15.5' TO FACE OF WHEEL STOP PLUS 2.5' OVERHANG OF VEHICLE OVER HANG OF VEHICLE OVER WHEEL STOP = 18'). 2. PROVIDE (5) WHEEL STOPS ON WEST PERIMETER. 3. LABEL SW PARKING SPACE "15 MINUTE PARKING". 4. PAAL (DRIVEWAY) MUST BE A MINIMUM OF 24'. |