Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/16/2009 | BUILDING - FINAL | Approved | IVRS - Inspection :* | |
| 01/15/2009 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) WORK NOT COMPLETE ENOUGH TO INSPECT |
|
| 01/09/2009 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) NOTES 2 & 8 FROM PREVIOUS 2) HOUSE NOT INSULATED |
|
| 01/08/2009 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) CANCELLED BY VICTORIA |
|
| 01/06/2009 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) A/C UNIT OVER FUSED 45 MAX 2) GFCI PROTECT SERVICE 110 ON ROOF TOP WITH WEATHERED COVER 3) GROUND ROD SYSTEM AND BOND NEW PANEL 4) 2-20 AMP CIRCUITS REQUIRED KITCHEN 5) NEW WATER HEATER REQUIRES COMBUSTION RELIEF 100 CU INCH AND DRIP LEG 6) GROUND ALL METAL BOXES/INSTALL PROPER ROMEX CONNECTORS THROUGHOUT 7) SECURE ALL ROMEX 8" FROM BOX 8) ROMEX INSULATION MUST TERMINATE IN BOX 9) INSTALL APA SHUT OFF AT STOVE VALVE 10) INSTALL HARD WIRED SMOKE DETECTORS THROUGHOUT, MISSING IN HALLWAY AND UNPERMITTED ROOM 11) PROVIDE ATTIC ACCESS EXISTING HOUSE 12) CEILING FAN BOXES REQUIRED TOTAL REMODEL INTERIOR 13) PROVIDE ACCESS TO ATTIC 14) REFEE TO APPLY NEXT DENIAL |
|
| 12/31/2008 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NO ONE HOME 2) HOUSE LOCKED 3) PLEASE CALL FOR RE-INSPECTION |
|
| 12/19/2008 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 12/17/2008 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 12/16/2008 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 12/15/2008 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 11/07/2008 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. EXPOSE FOOTERS TO VERIFY DEPTH 2. EXPOSE BOTTOM PLATES TO VERIFY TREATED PLATES 3. EXPOSE ALL ELECTRICAL COVERED W/O INSPECTION OR PROVIDE APPROVED LETTERHEAD FROM LICENSED ELECTRICIAN STATING ALL WORK DONE TO CODE VERIFY GROUNDING TO ADDITION 4. PROVIDE ACCESS TO ATTIC 5. PROVIDE ACCESS TO ROOF TOP UNIT 6. PROVIDE GAS PRESSURE TEST 7. PANEL SCHEDULE DOES NOT MATCH 8. FLOOR PLAN DOES NOT SHOW CLOSET STOPPED INSPECTION IF TO BE USED AS BEDROOM WINDOW SILL HEIGHT ABOVE 44" |