Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/28/2009 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 10/26/2009 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 1) COMPLETE VENTS FOR ALL REGULATORS 2) COMPLETE PRYING AT BBQ& POOL AREA |
|
| 10/20/2009 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 1) COMPLETE GAS PIPING AT POOL, PROVIDE APPROVED PLANS ON SITE 2) 2"-2 1/2" STUB OUT OF WALL ON WEST SIDE HOLDING 15 PSI TEST |
|
| 10/15/2009 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* | |
| 09/04/2009 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* | |
| 08/21/2009 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 1) FROM 1 1/2 STUB UP IN POOL EQUIPMENT AREA TO CAPS IN WOK BOWLS AT POOL TEST OK |
|
| 08/18/2009 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 1) 5 PSI TEST FROM METER LOCATION THRU TO ALL GAS REGULATORS CAPPED DOWN STREAM EXCEPT POOL EQUIPMENT AND GAS WOCKS AREAS 2) NEED TO SEE CONTINUATION AT POOL EQUIPMENT AREA, WATER HEATER AREA FROM REGULATOR TO HEATERS AND CONTINUATION TO ALL APPLIANCE SHUT OFF AS REQUIRED 3) RE-TEST GAS WOKS TO CAPS BECAUSE OF OFF SET |
|
| 08/17/2009 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 1) TEST ON PIPING FROM POOL EQUIPMENT AREA TO 1 1/2 TO (3) GAS POTS (FIRE WOKS) THRU VAVLES TO CAPS AT APP. 5' AFF PER REVISED GAS PLAN ON SITE |
|
| 08/14/2009 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 1) 1" STUB UP FROM WEST POOL LOOPED TO SPA HEATER TEST-OK 1) 1 1/2" STUB UP FROM WEST POOL HEATER LOOPED TO JUST BEFORE BRANCH TEE AT FIRE WOCKS (TEST PARTIAL) COMPLETE TO FIRE WOCKS |
|
| 06/25/2009 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 1. UNDERGROUND GAS PIPING TO POOL & BBQ TEST 60 PSI OK PER RED LINES 2. PER RED LINES GAS PIPING 60 PSI STUB OUT FROM MAIN ONLY IN WATER HEATER ROOM 3. STUB DOWN FOR DRYERS TEST OK 60 PSI |