Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/01/2009 | FRAMING | Approved | IVRS - Inspection :* | |
| 11/18/2009 | FRAMING | Not ready for Inspection | IVRS - Inspection :* 1) CANCELLED PER CONTRACTOR |
|
| 07/30/2009 | FRAMING | Partial Approval | IVRS - Inspection :* HZ5 ON MAINTURE SHED |
|
| 07/28/2009 | FRAMING | Partial Approval | IVRS - Inspection :* 1) INSTALL H2.5 ON MAINTENANCE BLDG |
|
| 07/24/2009 | FRAMING | Partial Approval | IVRS - Inspection :* 1) REMAINING SHEARWALLS COMPLETE 2) NOTE: VALVES CANNOT BE ENCLOSED |
|
| 07/15/2009 | FRAMING | Partial Approval | IVRS - Inspection :* 1) S.W. 4 + 5 WEST 1/2 OF 1ST FLOOR AND EXPANSION BOLTS AT GAZEBO |
|
| 07/10/2009 | FRAMING | Partial Approval | IVRS - Inspection :* 1) 2ND AND 3RD FLOOR RETURN AIR HEADING OK |
|
| 07/06/2009 | FRAMING | Partial Approval | IVRS - Inspection :* 1) HEADERS FOR RETURN AIR BY STAIRS NOT DONE CORRECTLY |
|
| 07/02/2009 | FRAMING | Partial Approval | IVRS - Inspection :* 1) 1ST FLOOR WEST OF ELEVATION, FIRE CAULKING-OK 2) BOTH ELEVATOR EQUIPMENT ROOMS |
|
| 06/25/2009 | FRAMING | Partial Approval | IVRS - Inspection :* 1ST FLOOR EAST OF ELEVATOR HOLD DOWNS & PLATE BOLTS OK |
|
| 06/23/2009 | FRAMING | Partial Approval | IVRS - Inspection :* 1. 1ST FLOOR WEST OF ELEVATOR; HOLDDOWNS AND BOTTOM PLATE BOLTS OK 2. 3RD FLOOR UTILITY ROOMS FIRE CAULKED |
|
| 06/19/2009 | FRAMING | Partial Approval | IVRS - Inspection :* 1)1ST FLOOR BOLTING BEHIND TUBS WEST FROM ELEVATOR |
|
| 06/18/2009 | FRAMING | Partial Approval | IVRS - Inspection :* 1) ROOM 232 SHEAR NOT COMPLETE AND 2ND FLOOR EAST OF ELEVATOR OK |
|
| 06/12/2009 | FRAMING | Partial Approval | IVRS - Inspection :* WEST OF ELEVATOR |
|
| 06/11/2009 | FRAMING | Partial Approval | IVRS - Inspection :* SHEAR WALL INTERIOR 3RD - 2ND SIDE |
|
| 06/08/2009 | FRAMING | Partial Approval | IVRS - Inspection :* WEST 1/2 - 2ND FLOOR 200 TO 220 54 AND 55 DOUBLE SHEAR WEST 1/2 2ND FLOOR |
|
| 06/04/2009 | FRAMING | Partial Approval | IVRS - Inspection :* 3RD FLOOR EAST OF ELEVATOR OK FIRE CAULKING OK |
|
| 05/21/2009 | FRAMING | Partial Approval | IVRS - Inspection :* 1) 3RD FLOOR STRAPS AND SHEARWALL LAGS COMPLETE 2) 1ST FLOOR HOLDOWN AND STAIRWELLS COMPLETE, OK TO SHEETROCK WITH TRADE OK |
|
| 05/18/2009 | FRAMING | Partial Approval | IVRS - Inspection :* 1. 3RD FLOOR W & S WINGS FIRE CAULK ELEC AND PLUMBING 2. 3RD FLOOR INTERIOR STEM WALL |
|
| 05/13/2009 | FRAMING | Partial Approval | IVRS - Inspection :* 1) 1ST FLOOR STAIR WELLS OK TO HANG 1ST LAYER |
|
| 05/06/2009 | FRAMING | Partial Approval | IVRS - Inspection :* 1. RM. 236 MISSING SIMPSON STRAPS 2. OK TO PRE-ROCK TUB AREA |
|
| 05/04/2009 | FRAMING | Partial Approval | IVRS - Inspection :* 1. 3RD FLOOR CORRIDOR FRAMING OK 2. OK TO ROCK LID BEHIND TUBS WEST, SOUTH WINGS 2ND FLOOR |
|
| 04/30/2009 | FRAMING | Not ready for Inspection | IVRS - Inspection :* PER GENERAL NOTES: WRGB TO BE USED IN BATHROOMS |
|
| 04/10/2009 | FRAMING | Not ready for Inspection | IVRS - Inspection :* 1. WESTERN TECH. SPECIAL INSPECTED (EXT. SHEATHING) 2. NAILING OK STILL NEED HOLD DOWN & STRAP INSPECTION 3. OK TO START PAPERING |
|
| 03/31/2009 | FRAMING | Partial Approval | IVRS - Inspection :* 2ND FLOOR CORRIDOR OK TO HANG LID |
|
| 03/30/2009 | FRAMING | Partial Approval | IVRS - Inspection :* PARTIAL 1ST FLOOR CORRIDOR LID OK TO ROCK |
|
| 03/18/2009 | FRAMING | Not ready for Inspection | IVRS - Inspection :* |