Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - RECONNECT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/26/2009 | ELECTRIC - RECONNECT | Approved | IVRS - Inspection :* | |
| 12/16/2008 | ELECTRIC - RECONNECT | Partial Approval | IVRS - Inspection :* 1) WILL EXTEND ANOTHER 30 DAYS FOR TEMP POWER |
|
| 11/13/2008 | ELECTRIC - RECONNECT | Partial Approval | IVRS - Inspection :* 1) WILL EXTEND ANOTHER 30 DAYS FOR TEMP POWER |
|
| 10/09/2008 | ELECTRIC - RECONNECT | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NEED TO CALL BACK FOR RE-INSPECT AT 30 DAYS. I WILL LEAVE POWER ON FOR CONSTRUCTION ONLY. PROGRESS IS BEING MADE 2) WROUGHT IRON ON BEDROOM WINDOWS MUST BE BROUGHT UP TO CODE |
|
| 09/05/2008 | ELECTRIC - RECONNECT | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) W/HEATER NEES TO BE IN A ENCLOSURE AND CONNECTED PER CODE 2) MECHANICAL ROOM NEEDS TO BE SEALED IN CEILING (FIRE PROTECTION) 3) SKY LIGHT CEILING NEEDS TO BE SEALED 4) NEED SMOKIES IN GREATROOM (HALLWAY) 5) ALL RECEPTACLES AND SWITCHES MUST HAVE FACE COVER PLATES 6) NEED TO SEAL ALL PENETRATIONS INTO BLDG ENVELOPER 7) HOUSE IS BEING OCCUPIED WAS GIVEN 30 DAY TEMP POWER-NEED TO CORRECT AND COMPLY WITH ITEM #1-6 8) WILL NEED TO GET RECONNECT APPROVED BEFORE POWER IS TURNED ON |
|
| 08/06/2008 | ELECTRIC - RECONNECT | Partial Approval | IVRS - Inspection :* 1) CLEARED FOR 30 DAY TEMP POWER-CALL FOR INSPECTIONS BY 9/05/08 |
|
| 08/05/2008 | ELECTRIC - RECONNECT | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NEED TO RELOCATE SMOKIE IN BACK BEDROOM 2) NEED TO BLANK ALL UNUSED LIGHT BOXES |