Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T08CM02501
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/21/2011 | PLUMBING - FINAL | Approved | Arch provided as-built drawings, photos of construction and letter from contractor and Landscape Arch for the water harvest tank installation. Approved |
|
01/11/2011 | PLUMBING - FINAL | Not ready for Inspection | Contractor not on site, no approved plans on site. I spoke to owner who called Arch. I told her that the EOR or Arch of record should provide a cert letter stateing that the system was installed per plan, provide this letter with an as-built site plan for the grading permit. | |
12/23/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* |