Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/20/2009 | PLUMBING - GAS PRESSURE TEST | Approved | ||
| 08/05/2009 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 1) TEST FROM 1" STUB UP AT METER TO 1" STUB UP AT WATER HEATER-OK 2) GAS IS ON AT METER INSPECTOR WILL NEED TO SEE MINIMUM SOAP TEST OF FINAL CONNECTIONS AT BOTH ENDS OF PIPING 3) NOTE: SEE BASIC INSTALLATION INSTRUCTIONS PAGE 23 OF RINNAI BOOKLET FOR WATER PIPING AND NOTE #5 PAGE P1.01 FOR INSULATION OF COLD AND HOT WATER PIPING 4) WATER PIPING FOR YARD LINE IS OK |
|
| 08/04/2009 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1) NO ACCESS AT 11:00 AM-GATE LOCKED |
|
| 07/21/2009 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE MINIMUM 10 PSI TEST ON GAS SYSTEM WITH NO LOSS OF PRESSURE FOR 15 MINUTES. TEST GAUGE TO BE IN 1/10 POUND INCREMENTS 2) PROVIDE 1" GAS PIPING PER PLAN 3) PLASTIC GAS PIPING UNDERGROUND REQUIRES MINIMUM 18" OF COVER AND SHALL BE EXPOSED FOR INSPECTION 4) WATER HEATER GAS SHUT OFF VALVE IS REQUIRED TO BE INSTALLED PRIOR TO GAS FLEX WHICH SHALL MEET BTU DEMAND OF WATER HEATER 5) PEX WATER PIPING CANNOT BE EXPOSED TO SUNLIGHT OR IN LOCATIONS WHERE DAMAGE CAN OCCUR 6) INSTALL RINNAI PER MANUFACTURERS INSTALLATION 7) SEAL ALL PIPE PENETRATIONS INTO BLDG |