Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
Permit Number - T08CM02389
Inspection Description - FRAMING
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/30/2008 | FRAMING | Approved | IVRS - Inspection :* | |
09/26/2008 | FRAMING | Not ready for Inspection | IVRS - Inspection :* 1) STILL INSTALLING 2) ROOF NAIL NOT SIGNED OFF SHIM 3 PT TRUSSES WHERE REQUIRED. LEAVE TRUSS DRAWINGS ON SITE 3) CHECK NOTCHING OF REAR GABLE END TRUSS AT TOP CHORD 4) BACKING AT TUB SIDES 5) PROTECT CONDENSATE AT GARAGE SIDE 6) BANG PLATE PEX HALL BATH 7) BLOCK OSB AT REAR END OF SHEET NOT SUPPORTED 8) MISSING MECH PAGE IN PLAN SET, R-6 INSULATION DUCT (FLEX). WHERE DOES INSULATION GO ? 9) 3-16D IN BOTTOM OF EACH FRAMED SHEAR PANEL NAILED DOWN INTO DBL TOP PLATE |