Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T08CM02288
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/07/2018 | ENGINEERING - FINAL | Approved | ||
11/07/2018 | ENGINEERING - FINAL | Approved | ||
10/26/2018 | ENGINEERING - FINAL | Not ready for Inspection | I met with Hector the owner, Tyler with tbj construction, and Monica our translator in the first Suite. Please complete the work shown on the plan, or revise the plans to show what has not been done. There was asphalt where D G is shown on the plan, we are missing three trees and several shrubs noted as number 13 and 14 on page l b. | |
08/27/2018 | ENGINEERING - FINAL | Not ready for Inspection | Complete all work shown on plan plant or replace missing plants and correct staking as shown | |
10/02/2017 | ENGINEERING - FINAL | Partial Approval | COMPLETE ALL ITEMS ON THIS SITE FOR ENGINEERING AND LANDSCAPING PRIOR TO CALLING IN ADDITIONAL INSPECTIONS | |
06/09/2017 | ENGINEERING - FINAL | Continued | CHECKING SIDEWALK SLOPES ON WEST SIDE OF BUILDING. |