Permit: T08CM02288

Parcel: 120063210


Addresses:

4301 S 6TH AV


Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Permit Number - T08CM02288

Inspection Description - ENGINEERING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
11/07/2018 ENGINEERING - FINAL Approved
11/07/2018 ENGINEERING - FINAL Approved
10/26/2018 ENGINEERING - FINAL Not ready for Inspection I met with Hector the owner, Tyler with tbj construction, and Monica our translator in the first Suite. Please complete the work shown on the plan, or revise the plans to show what has not been done. There was asphalt where D G is shown on the plan, we are missing three trees and several shrubs noted as number 13 and 14 on page l b.
08/27/2018 ENGINEERING - FINAL Not ready for Inspection Complete all work shown on plan plant or replace missing plants and correct staking as shown
10/02/2017 ENGINEERING - FINAL Partial Approval COMPLETE ALL ITEMS ON THIS SITE FOR ENGINEERING AND LANDSCAPING PRIOR TO CALLING IN ADDITIONAL INSPECTIONS
06/09/2017 ENGINEERING - FINAL Continued CHECKING SIDEWALK SLOPES ON WEST SIDE OF BUILDING.