Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/28/2008 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* PLEASE SEE NOTE #4 FROM 8/26/08 INSPECTION HISTORY THIS PAGE AND COMPLY PRIOR TO CONCRETE POUR BACK |
|
| 08/26/2008 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE UNIFORM 2% FALL ON PIPING WITH TEST 2. PVC PLASTIC PIPING MUST BE PROTECTED FROM SUNLIGHT 3. INSTALL CLEANOUT ON FLOOR SINK VENT RISER 4. PROVIDE PIPE WRAP THRU CONCRETE |