Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/07/2008 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* 1) DWV PIPING INSTALLED PER CODE. PLEASE REVISE PLAN TO MATCH 2) OK TO COVER |
|
| 07/11/2008 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1. PROVIDE CITY OF TUCSON APPROVED FOR AAV AT SINK PER REDLINE DRAWING 2. ROUGH SOIL TEST OK VENT THROUGH ROOF TEST OK 3. WATER PIPING IN WALLS TEST OK 4. CALL BACK FOR PRE-SLAB |