Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
Permit Number - T08CM02057
Inspection Description - PLUMBING - ROUGH, SOIL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/03/2009 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
02/06/2009 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 4" BLDG. DRAIN TO WITHIN 6' OF P.O.C TO EXISTING 6" SDR35 OK TO COVER |
|
01/21/2009 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* YARD WATER FOR "D" AND "C" TYPE "K" COPPER FROM CONNECTIONS AT EXISTING SITE WATER THRU METER SET AND UP TO RPPBP OK BACKFLOW DEVICE INSTALLED |
|
01/15/2009 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1. UNABLE TO LOCATE APPROVED PLAN FOR STORM DRAINS USUALLY IF THE PLAN HAS BEEN REVIEWED, THEN THE APPROPRIATE INSPECTION CODE WILL POP UP. STORM DRAINS ARE LOOKED AT BY ENGINEERING AND/OR BUILDING INSPECTORS. THEY WILL WANT TO SEE AN APPROVED PLAN ALSO. 2. WHEN YOUR CONTRACTOR INSTALLS BUILDING SEWER OR SITE WATER YOU WILL BE REQUIRED TO PROVIDE AN APPROVED SITE UTILITY PLAN. |