Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/10/2008 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* 1) CORRECTIONS MADE OK 2) INSTALLED PER RED LINES 3) OK TO COVER UNDERGROUND |
|
| 10/07/2008 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | 1. REVISED PLUMBING ISO TO BE IN RED AND TO BE ON THE APPROVED PLAN 2. 4" BRANCH TO HAVE A FULL SIZE CLEANOUT 3" BRANCH TO HAVE A FULL SIZE CLEANOUT 3. VENT FITTINGS BELOW THE FLOOD RIM TO BE DRAINAGE TYPE CHECK SLOPE OF BUILDING DRAIN. MUST BE AT LEAST 2% 4. CONTINUED "NOT READY" WILL RESULT IN REINSPECTION FEE UNCLEAR WHAT DELTA ONE REVISION IS |
|
| 10/06/2008 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* NOT INSTALLED PER PLAN - NO REDLINES ON SITE |