Inspection History Details
Inspection Status: Approved
Inspection History: REINFORCED MASONRY PRE-GROUT
Permit Number - T08CM02020
Inspection Description - REINFORCED MASONRY PRE-GROUT
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/14/2009 | REINFORCED MASONRY PRE-GROUT | Approved | IVRS - Inspection :* 1) LAST OF DUMPSTER WALLS |
|
| 04/06/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. DUMPSTER S.W. CORNER OF EXISTING BLDG. 2. S.W. LOADING DOCK WALL 3. 2 SO DUMPSTER ENCLOSURES |
|
| 11/04/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. TOP OUT OF MAIN BLDG. OK 2. NEED RFI FOR EPOXY OF MISSED LEDGER BOLTS |
|
| 11/03/2008 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | IVRS - Inspection :* | |
| 10/31/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. 1-A TO B 20' TO 24' 2. 1-B TO D TO 28'4" TO PORT 3. A-1 TO 3 TO 24'8" 4. 7-G TO H TO 32 5. K-2.5 TO 3 AND 4.5 TO 5.5 TO 28'4" |
|
| 10/30/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. A-1 TO 4 1 - A TO B TO 20' 1 - B TO D TO 24' 2. NEEDS SPECIAL INSPECTION |
|
| 10/29/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* ALL PROGRESS @ NW AREA OK |
|
| 10/28/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. C TO A -- 12' TO 16' 2. A 1 TO 3.5 TO 12'8" 3. 7-B TO D TOP OUT 28'4" DOUBLE #6 4. 7-E TO G TO 28'8" 5. NEEDS SPECIAL INSPECTION |
|
| 10/27/2008 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | IVRS - Inspection :* MIN. 42" LAP FOR #7 REBAR |
|
| 10/26/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* SOUTH WALL TO 24'8" EAST OF DEPRESSION WEST WALL A-7 TO 3 TO 24'8" A-3 TO 1 TO 8' |
|
| 10/23/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* K-2.6 TO 3.2 K-4.6 TO 5.2 20 TO 24 7-G TO K TO 28'4" A-7 TO 3 20'8" |
|
| 10/22/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. 1-A TO D TO 8' A-3 TO 7 TO 16'8" A-2 TO 3 1ST LIFT PILASTERS 1-D TO F TO 20' 2. SPEEDIE SPECIAL INSPECTED |
|
| 10/21/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 7-A TO D 16' 2' A-3 TO 7 8' TO 12' |
|
| 10/20/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 7-G TO K 20'8" TO 24'8" A-7 TO 3 4'8" TO 8'8" 7-D TO A 12'8" TO 16'8" |
|
| 10/17/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1 - H TO K 28'4" AFF (TOPOUT) 1 - D TO F 20'8" AFF 7 - H.5 TO K TO 24'8" ROOF LINE NEED STAMPED ENGINEERED APPROVAL FOR CONTROL JOINT LOCATIONS |
|
| 10/16/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 7-A TO D 8'8" TO 12'8" 1 - A TO C TO 4'8" 7 - H.5 TO K 24'8" |
|
| 10/14/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 7 - A TO D 4'8" TO 8'8" 1 - A TO D 12'8" TO 16'5" |
|
| 10/13/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1 K TO D 4TH LIFT ADDING #7 JAMB BARS |
|
| 10/10/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | 20'8" SOUTH WALL K-D; 5' SOUTH & WEST LINE A 3-5 5' LINE K A-D |
|
| 10/09/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. K-1 TO 3, K-4.5 TO 7, 7-D TO K, 1-E TO K TO 16' AFF 2. 1-C TO E 8'11" AFF ADD MISSING JAMB BARS 3. SPEEDIE SPECIAL INSPECTED |
|
| 10/08/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 3RD LIFT K-1 TO 3 1-K TO D |
|
| 10/07/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 3RD LIFT N. LOADING DOCK RAMP WALL OK TO CLOSE 7 - O TO K NEEDS SPECIAL INSPECTION |
|
| 10/06/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. 2ND LIFT 1 - K TO D K - 1 TO 3 (4) S1.4 SCHEDULE S1.1 SPEEDIE SPECIAL INSPECTED |
|
| 10/03/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. 2ND LIFT 7 - K TO D K 4.6 TO 7 2. ALL JAMB BARS ARE #7 3. MIN.LAP #5 BAR 30" |
|
| 10/02/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1ST LIFT LINE 1 -- K TO D TO BE SPECIAL INSPECTED |
|
| 10/01/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. ALL JAMB BARS #7 2. FIRST LIFT 5' AFF K- 1 TO 3 7 - D TO 6 1 - K TO F 3. STEM WALL REMAINING WEST 2/3 OF N.WALL |
|
| 09/30/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. K TO 6 1ST LIFT INSTALL CORRECT JAMB BARS 2. STEM WALL K-1 TO 4 1-K TO E |
|
| 09/29/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. LINE 7 - K TO B --- STEM WALL 2. WHERE BOND BEAM IS INTERRUPTED FOR ROOF DRAINS A BOND BEAM WILL BE POURED ABOVE SLEEVES 3. TO BE SPECIAL INSPECTED |