Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/13/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* IRRIGATION TO POTABLE WATER CONNECTION HAS BEEN ELIMINATED. A PERMIT IS REQUIRED TO MAKE SUCH A CONNECTION. |
|
| 03/12/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. REMOVE TEST PLUG AND INSTALL COUNTER SUNK TAPPED CLEANOUT PLUG. OK TO COVER WALL (CONTRACTOR COMPLETED) 2. PROVIDE VERIFICATION OF STERILIZATION (CLEAN BACTERIA REPORT ON SITE) 3. DELTA ONE REVISION THERMOSTATIC MIXING VALVE AT LAVATORY |
|
| 02/27/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. W.C CLEANOUT REQUIRES EIGHTEEN INCHES OF CLEARANCE IN FRONT OF CLEANOUT 2. PROVIDE VERIFICATION OF INSTALLATION FOR DELTA ONE REVISION 3. PROVIDE VERIFICATION OF STERILIZATION OF WATER SYSTEM 4. PROVIDE CLEAN BACTERIA REPORT SEE CIRCLED NOTES ON P-1 |