Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/13/2008 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 06/12/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. TRANSITION GLUE NOT APPROVED FOR USE WITHIN BUILDING, USE MISSION COUPLING. 2. CAST IRON REQUIRED WHERE EXPOSED OUTSIDE 3. USE SOLVENT WELD TEST TEES W/SOLID CAPS 4. MINIMIZE EXCESSIVE CO TEES 5. INSTALL CO CLOSE TO FIXTURE 6. SUPPORT PLASTIC AT CHANGE OF DIRECTION, ELEVATION AND NOT MORE THAN 4' 7. BRACE VERTICAL PIPING IN WALL 8. OK TO INSULATE COPPER AFTER WIPING OFF EXCESS FLUX 9. OK TO COVER NON-PLUMBING WALLS W/BUILDING INSPECTORS OK |