Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - ABOVE CEILING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/22/2009 | MECHANICAL - ABOVE CEILING | Approved | IVRS - Inspection :* | |
| 03/31/2009 | MECHANICAL - ABOVE CEILING | Not ready for Inspection | IVRS - Inspection :* | |
| 03/30/2009 | MECHANICAL - ABOVE CEILING | Not ready for Inspection | IVRS - Inspection :* | |
| 03/25/2009 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* SECOND FLOOR OK FOR TILES MECHANICAL ONLY |
|
| 03/24/2009 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* | |
| 03/23/2009 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* 2ND FLOOR NO COMBUSTIBLE MATERIAL IN PLENUM |
|
| 03/04/2009 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* | |
| 03/03/2009 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* OK FOR TILES 1ST FLOOR |
|
| 03/02/2009 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* START COLLARS NOT SEALED AT BOOT BOXES SEAL ALL RECT. DUCT SUPPLY DUCT AT UNITS NOT SEALED COMPLETE INSULATION AT BRANCH TAPS PER DETAIL 8 |
|
| 02/19/2009 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* | |
| 02/17/2009 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* | |
| 12/15/2008 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* CORRECTIONS HAVE BEEN MADE WEST SIDE |
|
| 12/11/2008 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* 1. PROVIDE MIN. 1/8" PER FT. SLOPE ON CONDENSATE PIPING 2. PLANS REQUIRE METAL DRAW BANDS ON ALL FLEX DUCT CONNECTIONS 3. CAP OFF CONDENSATE VENTS IN ATTIC SPACE WEST SIDE 4. REMOVE ANY PVC FROM PLENUM CEILING 5. OK CEILING TILES A WEST 6. DUCT SMOKE DETECTORS MUST BE UPSTREAM OF ANY FRESH AIR AND FILTERS 7. PROVIDE ACCESS TO ALL FAN COILS |