Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T08CM01596
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/11/2008 | ENGINEERING - FINAL | Approved | Contractor completed punch list. | |
11/25/2008 | ENGINEERING - FINAL | Denied | Prelim Punch List. Contractor needs to address items and call for re-inspection. 1- Complete trash enclosure per 6-01, per approved drawings or provide approved DMSR. 2- Close out grading permit. 3- Remove all material from fence line. Provide 2' set back per approved drawings. 4- Complete all bike parking. 5- Complete installation of all ground stabilizing material. 6- Provide site cert. from engineer, per C.O.T D.M. chapter XIV, section 14.2 (7). 7- Engineer needs to address 1 to 1 and vertical slope on southwest side of project. 8- Clean all wash out from site. 9- Remove all SWPPP controls. 10- Engineer needs to address slope stabilization east side of project. |