Permit: T08CM01561

Parcel: 12904157A

Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Permit Number - T08CM01561

Inspection Description - EXCAVATION/LAYOUT REBAR & ZON

Inspection Status - Approved

Date Description Inspector Results Comments
01/21/2010 EXCAVATION/LAYOUT REBAR & ZON Approved IVRS - Inspection :*
1) STAIR WELL COLUMN FOOTING (C3/F3) OK TO POUR
01/20/2010 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) NORTH STAIRWELL FOOTING (F6) OK TO POUR WHEN FOOTING IS DRY
12/15/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) 3 SECTIONS OF SITE WALL FOOTINGS (NORTH WALL) OK TO POUR
12/04/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) CLOSURE POUR DETAIL #103, PAGE S3.0; NOTE #4 PAGE S2.1.1-OK TO POUR
12/01/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) 20 COLUMNS MASONRY PRE-GROUT AT 11'-4" OK TO GROUT
11/30/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) EAST PORTION OF BLDG 1A-CONTINOUS FOOTINGS
11/25/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
BLDG 1B-10 MC1-0 24" FOOTINGS; BLDG 1A 20 MC1 COLUMNS AT 4'-8' OK TO GROUT PROGRESS AREAS
11/24/2009 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
1) CONTRACTOR CANCELLED
11/20/2009 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
11/17/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) 20 F2 COLUMN FOOTINGS AT BLDG 1H; DETAIL #113 PAGE S3.0; COLUMN SCHEDULE-OK TO POUR FOOTINGS
11/16/2009 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
1) CONTRACTOR CANCELLED
11/13/2009 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
1) CONTRACTOR CANCELLED
11/12/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) ELEVATOR (EAST) STEM WALLS-BLDG #1A, DETAILS #117, 118 PAGE S3.0-OK TO POUR STEM WALLS
11/10/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) SITE WALL-BOND BEAM AT 12"-APPROX 240'-OK TO GROUT PROGRESS AREA
11/09/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) EAST ELEVATOR PIT; DETAILS #117-118 PAGE S3.0-OK TO POUR ELEVATOR FOOTING
11/04/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) SCREEN WALL FOOTING-APPROX 400'-NORTH SIDE DETAIL #SK1, 10/09/09; TRASH ENCLOSURE FOOTINGS (SAME DETAIL) OK TO POUR PROGRESS AREAS