Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T08CM01537

Parcel: 12810082B

Inspection Status: Approved

Inspection History: PLUMBING - FINAL

Permit Number - T08CM01537

Inspection Description - PLUMBING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
01/26/2009 PLUMBING - FINAL Approved ROASTER APPROVED THROUGH FIELD EVALUATION SEALED BY P.E.
12/23/2008 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
PROVIDE LISTING FOR ROASTER
12/16/2008 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
1. CALL IN ALL PLUMBING INSPECTIONS ON YOUR PERMIT CARD FOR APPROVAL
2. PROVIDE TEST ON GAS SYSTEM IN ENTIRETY
3. PROVIDE MINIMUM 1" AIR GAP ON ALL INDIRECT DRAINS
4. PROVIDE BACKFLOW CERTIFICATIONS ON ALL DEVICES
5. PROVIDE BACTERIA REPORT FOR POTABLE WATER
6. READ ALL NOTES AND INSTALL ACCORDINGLY
7. WATER HEATER EXPANSION TANK REQUIRES SUPPORT AND SECURE
8. ALL FIXTURES TO BE WATER TIGHT
9. HAVE LADDER AVAILABLE FOR WATER HEATER INSPECTION
10. WATER HEATER CANNOT BE SOLE CONTROL OF HOT WATER TEMPERATURE - NOT TO EXCEED 110 DEG. AT PUBLIC USE LAV
11. ROASTER REQUIRES A LISTING PLATE

LIST MAY NOT BE COMPLETE