Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/18/2008 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 06/17/2008 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. PROVIDE APPROVED TRANSITION FROM PVC TO ABS AT CONNECTION TO EXISTING BUILDING DRAIN 2. PROVIDE LONG RADIUS DRAINAGE FITTINGS FOR ALL DRAINAGE 3. ALL FIXTURES REQUIRE VENTS 4. INSTALL PER APPROVED PLAN |