Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/01/2011 | FRAMING | Approved | IVRS - Inspection :* | |
| 11/22/2010 | FRAMING | Not ready for Inspection | IVRS - Inspection :* 1) NEED ALL INTERMEDIATES COMPLETED WITH THIS INSPECTION |
|
| 05/26/2010 | FRAMING | Partial Approval | IVRS - Inspection :* 1) GO AHEAD PUT ROOF STRUCTURE ON, INCLUDING ROOF DECK 2) YOU NEED H2.5 SIMPSON OR EQUAL METAL TIES, STUD TO BOTTOM PLATE, STUD TO TOP PLATE, RAFTER TO TOP PLATE, YOU CAN PUT THEM ON THE INSIDE OR OUTSIDE OF WALL 3) YOU NEED A BOLTS AT 6' 0" ON CENTER, 12" IN FROM EVERY JOINT 4) CONTINUE ON LOOKS GOOD |